Home > Tutorials

Plant TimeSheet Entry - PowerForce ™

Introduction

The following document outlines the use of time sheet entry screen based around the "Plant Department Daily Timesheets".

Getting There:

[N/A ] menu

Introduction

This time sheet has been designed to reflect the Plant Department Daily Timesheet, where you enter the days shifts on a per employee basis.

Entering Data

The basic design of the screens attempts to make the required data inputs intuitive and where possible pre-populated with drop-downs so that the data is immediately validated.

The data entry has the following specific logic.

  • If you enter a Plant Number and no Job Number, then the system expects to take an Equipment Cost Code in the Job/Equip Cost Code column.
  • As soon as you enter a Job Number, the field accepts only the Job Code.

Top of Page

Sample Cost Code

To enter data, press the dropdown button and then select the relevant cost-code.

 

See Also

Employee Timesheet Entry (ver 1)

Top of Page

Article updated by PowerForce Software on Friday, December 17, 2010.